post Aug 12 2011, 10:54 AM

Getting Started
**
Junior Member
56 posts

Joined: Jun 2011
QUOTE(kochin @ Aug 12 2011, 12:21 AM)
meaning where you want the position of the first tile to be laid.
this is for you to plan in order to:
1. minimise wastage
2. prevent small cut pieces (say 50-100mm at the end of your wall)
3. prevent joint line at unsightly area (say the joint line is crossing at somewhere obvious)

am also dictating where my floor trap should be. shocking.gif
*
Hi Kochin!

Don't mind if I point out one correction for you. Actually a 'start off point' in proper construction term is call Setting Out Point. Otherwise if you use the wrong term, some people might get a bit puzzle. Just my two cent.

And for floor trap/floor waste, it is always position next to the wc or at one corner so that all water will run to one point.

Hope this info is useful to you!