QUOTE(Chris Chew @ Feb 3 2012, 03:05 AM)
You need to be patient and time to get all right. It took Puchong-IOI 10 years to be now.Alam impian Pentas Superlink, I&P new super link July 2011
Alam impian Pentas Superlink, I&P new super link July 2011
|
|
Feb 3 2012, 01:53 PM
Return to original view | Post
#181
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,286 posts Joined: Nov 2010 |
|
|
|
|
|
|
Feb 15 2012, 11:55 AM
Return to original view | Post
#182
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,286 posts Joined: Nov 2010 |
|
|
|
Feb 15 2012, 06:50 PM
Return to original view | Post
#183
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,286 posts Joined: Nov 2010 |
QUOTE(UFO-ET @ Feb 15 2012, 02:57 PM) Nolah, there are 2 types of build up It is a norm for developer to include car porch as part of BU. a) Gross b/up - including porch area (covered) and patio (end lot / corner) - Normally applied in KV like Pentas 1,2,3 b) Nett b/up - excluding Porch & Patio - common in Penang If you take Pentas 1 as exmaple : the intermediate total b/up is 3152sf Building length is 18,285mm = 59.97 feet Building width = 7,650mm = 25 feet so the estimated gross build up (excluding porch) is 60'x25'x2 = 3000sf Pentas 1 has a void area of 10'x7' (70 sf) so the estimated gross build up after void area = 3000sf - 70 sf = 2930sf So I estimate the additional b/up of 222sf (3,152sf - 2,930sf) comes fr porch area. Look at Pentas 3, the indicative b/up = 3,273sf I assume if there is no void area inside the house, then the nett b/up (without porch area) for Pentas 3 is roughly = 3,273sf - 222sf (porch) = 3,051 sf with 3,051sf nett build up, I think the building length is (3,051 /2 / 25) = 61.02 feet only. Additional land is 24 feet still. The norm calculation is 0.5 x car porch area |
|
|
Feb 29 2012, 05:24 PM
Return to original view | Post
#184
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,286 posts Joined: Nov 2010 |
![]() Now, this is what I call LATE LAUNCHING~~~ |
|
|
Mar 1 2012, 01:05 PM
Return to original view | Post
#185
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,286 posts Joined: Nov 2010 |
QUOTE(waga @ Mar 1 2012, 12:58 PM) visited d'island today....saw show unit 25' x 100'..corner type.......UFO-ET......u r right! .....measured the living hall.....approx. 19'L x 25'W .....same as pentas 1 (visited yesterday/still under construction).....impression?.........am very impressed! except the pentas unit have a powder room up front. Welcome to the neighbourhood~~!! by next week i shd conclude the S&P........ |
|
|
Mar 1 2012, 08:28 PM
Return to original view | Post
#186
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,286 posts Joined: Nov 2010 |
|
|
|
|
|
|
Mar 2 2012, 02:23 PM
Return to original view | Post
#187
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,286 posts Joined: Nov 2010 |
QUOTE(waga @ Mar 2 2012, 11:19 AM) True....good house is not easy to find....been looking for months.....my criteria was....freehold / big BU / developer must not save on "current modern infrastucture like greenery / parks / lakes / other facilities that make life easy" If you go another one step further, you will end up CIMB vs. MAYBANK vs. HSBCall the above will be realize later(all this r in the brochure) since the project there is about 20% ??? and still moving forward and I & P is definitely a trusted name. LOAN Tomorrow...Alrajhi bank representative will come to my house to talk about their latest home loan promotion....email them when saw their spam all over the property threads last night...guess the LYN moderators has taken it off. what i like about this loan promo.....zec.... Zero Entry Cost-(ZEC free legal fees, free valuation, free stamping, free stamp duty). I shd say....quite a saving here but only will know when brief further and whether i will be successful or not......banks sometimes work in mysterious ways. |
|
|
Mar 4 2012, 10:50 AM
Return to original view | Post
#188
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,286 posts Joined: Nov 2010 |
|
|
|
Mar 7 2012, 10:21 AM
Return to original view | Post
#189
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,286 posts Joined: Nov 2010 |
Just received the first notification from I&P to my bank, asking for 10% for Pentas 2....
|
|
|
Mar 7 2012, 10:25 PM
Return to original view | Post
#190
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,286 posts Joined: Nov 2010 |
QUOTE(jet2020 @ Mar 7 2012, 10:12 PM) as at Monday, Pentas2 still got 27 unsold units due to loan rejections for the late buyers that were affected by the new ruling. Pentas3, at higher price, will be susah sikit to move in the coming Apr launch. 101 - 27 = 74 units left unsoldviewing the slowing sales, heard Pentas2 showhouse will be built soon and I&P mgt may build the perimeter fencing for Pentas. Suggest we continue to put pressure on I&P on the fencing. Look like not moving at all since last year. I agree with jet2020 the pentas 3 will have problem to move. |
|
|
Mar 8 2012, 10:10 AM
Return to original view | Post
#191
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,286 posts Joined: Nov 2010 |
QUOTE(yoki @ Mar 8 2012, 10:03 AM) actually, for I&P why not just try 1-2 phase, put perimeter fencing as selling point, see the units can move or not? I must raise a concern here before all the above is materialised.thing is they dun even wana try man, reflect the mentality of the management 1. refuse to change, facade also lazy to do diff one 2. complacent 3. ignorant 4. lazy 5. tak ape, u mau u beli, u tak mau, belah.... 1. Alam Impian is under jurisdiction of MBSA (Majlis Bandaraya Shah Alam). Some of the council, ie: MPKJ (Majlis Perbandaraan Kajang) DO NOT allow gated concept. Likewise, I have not visited MBSA for years and not sure what is their latest guideline for this. 2. Let say MBSA do not allow the developer to have gated and guarded. But you see some others development has such G&G, my personal view :- a) The developer is prepare NOT to handover the Road and Drainage, Or b) The developer obtain a special approval (which I don't think have any chance), Or c) The developer obtain more than 70% to have G&G and appeal to MBSA In most time, developer will pick option A to go ahead with GG if the local council is not in favour of G&G concept. |
|
|
Mar 8 2012, 04:00 PM
Return to original view | Post
#192
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,286 posts Joined: Nov 2010 |
|
|
|
Mar 8 2012, 04:43 PM
Return to original view | Post
#193
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,286 posts Joined: Nov 2010 |
QUOTE(UFO-ET @ Mar 8 2012, 04:07 PM) It is worth spending our own money to do it ourselves, the property value will increase at least another 10% for sure, m checking the cost (using anti-climb galvanized steel).. Normal chain fencing (the green color) - RM35/m (5ft)according to the main contractor, no allocation for the fence Hi-Sec fencing (closed-up rectangular form) - RM280/m (5ft) Added on March 8, 2012, 4:45 pm QUOTE(UFO-ET @ Mar 8 2012, 04:07 PM) It is worth spending our own money to do it ourselves, the property value will increase at least another 10% for sure, m checking the cost (using anti-climb galvanized steel).. How suppose i can go around to the lake infront of my unit wo..... according to the main contractor, no allocation for the fence Added on March 8, 2012, 4:42 pmDear fellow Pentas buyers, I have an unofficial GREAT NEWS!! Pentas 1,2 & 3 will probably hv anti-climb galvanised fence!!!!!! Wait for my further confirmation, dun ask the sales staff, they might not know. This post has been edited by Lionking1900: Mar 8 2012, 04:45 PM |
|
|
|
|
|
Mar 8 2012, 04:51 PM
Return to original view | Post
#194
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,286 posts Joined: Nov 2010 |
|
|
|
Mar 8 2012, 04:53 PM
Return to original view | Post
#195
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,286 posts Joined: Nov 2010 |
|
|
|
Mar 9 2012, 09:36 AM
Return to original view | Post
#196
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,286 posts Joined: Nov 2010 |
QUOTE(spydermind @ Mar 8 2012, 10:57 PM) the letter clearly mentioned Guarded ....and there is a big difference. To add on.To be honest, it is not fair for people to sign this. Extreme case, if the committee wants to charge 500 per month, do i need to pay just because i sign this..... I am not here to argue, but sometimes, really too many loopholes here and there....really hard to find a decent solution.... In this case, who knows there might be people against the idea of fencing up the place (block their accessibility) or divert them to walk longer distance to certain place.....dont be surprise... seriously 65/-75% agreement is consider low, in USJ or PJ, Puchong, kepong, i heard the local authority want more than 80%-90% 1. This is not s stratified properties, therefore there will be no JMB (Joint-Member-Board) between representative from developers and residences. 2. Pentas residences have to set up its own association and lead themselves. (Although in the first General Meeting, the developer will call and help) 3. The G & G fees is determined by the Pentas association. Not the others. Why the association want to impose so high cost? It is not logic for a RM500/month. This post has been edited by Lionking1900: Mar 9 2012, 09:39 AM |
|
|
Mar 9 2012, 10:06 AM
Return to original view | Post
#197
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,286 posts Joined: Nov 2010 |
QUOTE(Ang Ang @ Mar 9 2012, 10:00 AM) We all need to work as a team and agree toward fencing. Those minor monthly charges should not bring up as an major issue. Security is the most imprtant for nowadays and surely the cost to cover this is very minimum. Get the first step right. Well the 500/month may be truth when inflation is very high and it could happen in future but that may be perhaps 2050. Will it be a concern by then? Certainly is no. This milestone must be achieved, or else no others will be materialised. |
|
|
Mar 12 2012, 08:33 AM
Return to original view | Post
#198
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,286 posts Joined: Nov 2010 |
|
|
|
Mar 13 2012, 06:57 PM
Return to original view | Post
#199
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,286 posts Joined: Nov 2010 |
|
|
|
Mar 13 2012, 07:36 PM
Return to original view | Post
#200
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,286 posts Joined: Nov 2010 |
QUOTE(nkhong @ Mar 13 2012, 07:03 PM) Unfi for landed property will used fiber, highrise will use existing Phone cable line, no prblem. Whos da chairman? and how to apply ah?If the landed residentail area got coverage, the fiber can come to your home either through front or back, because unifi come with voice, internet and tv, so most probably u want to terminate the fiber at your living hall, if developer aledi lay the fiber inside house and conceal cantik cantik then it is a bonus, if not then it going to be a headache. My existing house tm pole at the back and fiber most probably coming from the back, to pull the fiber from back till living hall, i dont know how, maybe pull it through roof top till front of the house the drop it from master bed room to living hall. If you no need the tv channel and voice call then should be fine, just ask the installation guy to terminate on your roof top, you put wireless router at your roof top, then u access internet through wireless but make sure your wireless router got strong signal and can be reach from living hall. Just imaging your new house developer didnt install phone line and you going to pull new line into your living hall. A bit troublesome. Cable is visibl and ugly. Added on March 13, 2012, 7:06 pm Come come come, all SSBB are welcome to join ... Added on March 13, 2012, 7:18 pmInstallation video http://www.tm.com.my/unifi/help-support/Pa...ion-guides.aspx |
|
Topic ClosedOptions
|
| Change to: | 0.0560sec
0.60
7 queries
GZIP Disabled
Time is now: 9th December 2025 - 07:39 PM |