this is what i do for my 5x8 lawn
1. get the indon worker to dig it 6-8 inch below ground level
2. undersoil piping which drains the water to longkang (drilled with 20 cents coin size hole)
3. a layer of stone, small sized
4. a layer of PVC mesh
5. a layer of soft sand
6. a layer of planting soil
7. pearl grass!
all done with proper leveling
do not worry about lalang just treat it as some exercise on Sunday morning
Jul 11 2011, 12:04 AM
Quote
0.0134sec
0.43
6 queries
GZIP Disabled