Suriamas,Sunway Rm180k (200?) Now Rm400k (2011)
Solaris Rm2m once completed Rm4m
CBD2, Cyberjaya Rm1.8 (2009) Rm4m (2011)
Alam Impian semiD Rm750k (2009) Rm1.4(2011)
Alam Impian terrace Rm550k(2009) Rm1.0m(2011)cor
Which project in KV achieves the highest gain?, Launched Since 2000
Jul 17 2011, 09:11 PM
Quote
0.0205sec
0.16
6 queries
GZIP Disabled