Welcome Guest ( Log In | Register )

Outline · [ Standard ] · Linear+

 toilet renovation, & plaster ceiling issue

views
     
KVReninem
post Jun 23 2011, 01:34 AM

IX
*******
Senior Member
5,369 posts

Joined: Jan 2003
hi Gerl;

Do you mind tell me whose the contractor? im from your northern region side.

As far I know; you hav your rights & getting reckon from the builder/ contractor. But he cannot threaten you that he must get the job.

Do post up some of your selection; bcos sometimes in this land of hornbills; we do get ripoff.


Added on June 23, 2011, 1:36 am
QUOTE(gerl @ Jun 22 2011, 05:21 PM)

from my aunt..i think he did some stuffs for her sch..well i would get LYN to quote me but i'm in kuching so tt's not rly possible  blush.gif
well i guess don't really mind if he take abit commission, its business after all right? just that abit worry if rly cut throat, so check with u guys here lor..
hmm no ppl answer me yet..normally u guys will negotiate price or not? is it do-able or it's a no no later contractor give black face?  hmm.gif
*
It is possible; why not? you can ask the same here & im sure you can start compare the workmanship once its done. icon_rolleyes.gif

This post has been edited by KVReninem: Jun 23 2011, 01:36 AM
KVReninem
post Jun 23 2011, 03:42 PM

IX
*******
Senior Member
5,369 posts

Joined: Jan 2003
QUOTE(gerl @ Jun 23 2011, 12:14 PM)
urm he didn't threaten us or anything la..just that he's got quite a strong opinion since i guess he knows what he's doing from the yearss of experience?
it might be a good thing too la for clueless people like us but since info is available here n abit of google i guess we can try our best to get whatever's worth our money lor..
he might tink i'm being such a kpo girl tho for questioning this n that when my parents nvr even say much haha  sweat.gif

alrighty will do..we only selected the tiles and the shower screen color though so far..the rest we didn't pick anything at all. he pretty much recommend what look nice etc.

was very busy packing up last night since the kitchen is going to be hacked down.
this was a quick decision i guess coz the pipes were right on top of the kitchen and the water's leaking so badly into the cabinet n i guess my parents just ask to fix it asap..
i think i might have to go around looking for kitchen cabinets now.

er really? i thought ppl have to come down to ur house to give u a quotation. or at least have some sort of sketch or something right? otherwise how to quote  unsure.gif
*
atleast a existing drawing will do & what you want to renovate.

why dont snap some progress picture too? thumbup.gif


Added on June 23, 2011, 3:45 pm
QUOTE(gerl @ Jun 23 2011, 02:25 PM)
hmm ok.. i tink the one we chosen was ceramic n its alrdy delivered to the house. will consider this for the next 2 bathrooms. however u mention cheaper ceramic tiles have this high water pass thru rate, how do i know if its cheaper type or what? by the cost of it or..?  unsure.gif

yes we are tiling all the way up, and the guy say need to plaster before putting the tiles - tt was why the price was tt high when i asked him abt it.

we have the sink right outside the bathroom - due to space limitation and his suggestion which my parents agreed to already. i dont think have ventilator fan though, prolly coz there's a window?
urm yes, ur right and furthermore for people like me we also wont know what to look at to see if its done right, at most if it looks alright we'll take it as ok already...

alright, thanks smile.gif
*
A fan helps the ventilation; unless your toilet is positioned to windy condition where air travel true when night time all door shuts.

without fans; your toilet will be mouldy & more or less humid if you took a warm shower.


This post has been edited by KVReninem: Jun 23 2011, 03:45 PM
KVReninem
post Jun 29 2011, 05:22 PM

IX
*******
Senior Member
5,369 posts

Joined: Jan 2003
QUOTE(gerl @ Jun 28 2011, 02:03 AM)
sweat.gif alil too late for that edi..hopefully it'll be ok.

anyways here's the picture of the tiles..

user posted image
progress pictures - i only managed to snap one pic from before, after that they cement everything already. i have no idea what people normally wanna see so here goes:

user posted image

then here's after they tiled everything..

user posted image

i guess for bathroom what's left is the shower screen toilet and all that. kitchen is currently in progress too, but since this thread was for asking about bathrooms..  hmm.gif
anyways really thanks for all your inputs...will post summore when i got more questions. smile.gif
*
post kitchen too! laugh.gif well; atleast its good to see the standard all around Malaysia & then you can slowly learn to weed out bad contractors. smile.gif
KVReninem
post Jul 2 2011, 01:43 AM

IX
*******
Senior Member
5,369 posts

Joined: Jan 2003
QUOTE(gerl @ Jul 2 2011, 03:18 AM)
excuse the noobie question but is there any significant difference? as in if all is labelled stainless steel is there any way i would be able to tell the original stainless steel against the cheapo stainless steels?  unsure.gif
*
there are ways; one is chrome coated which mean will rusted-same like china stainless steel.

Good stainless steel dont rust at all.


 

Change to:
| Lo-Fi Version
0.0193sec    0.63    6 queries    GZIP Disabled
Time is now: 9th December 2025 - 07:58 PM