QUOTE(RickOoi @ Mar 13 2013, 10:12 PM)
Hi Phoenix69, thanks for the prompt reply.
I called 1 of the TNB approved contractor, what he told me is the same as what you have stated. In addition, he mentioned that if there is any cabling to be done, it will be charged per meter basis. He did not mentioned how much is that. He said that the length of the cable depends on how far the meter from the 'tiang' but I am guessing he is talking about underground? Need to verify on this.
If you don't mind, could you share with me your electrical contractor? I need to double check on the price. Thank you.
I called 1 of the TNB approved contractor, what he told me is the same as what you have stated. In addition, he mentioned that if there is any cabling to be done, it will be charged per meter basis. He did not mentioned how much is that. He said that the length of the cable depends on how far the meter from the 'tiang' but I am guessing he is talking about underground? Need to verify on this.
If you don't mind, could you share with me your electrical contractor? I need to double check on the price. Thank you.
QUOTE(phoenix69 @ Mar 15 2013, 08:48 AM)
Hi Phoenix69,could you pm me also for your electrical contractor?