Hopefully your KC guy is not that KC company that kena bombard like crazy
This post has been edited by RickOoi: Dec 29 2012, 05:13 PM
Renovation Extreme Work In Progress, Sharing my house renovation journey.
|
|
Dec 29 2012, 04:29 PM
Return to original view | Post
#1
|
![]() ![]() ![]()
Junior Member
403 posts Joined: Jun 2008 From: Kuala Lumpur |
I too look forward to your KC. Have been following your thread since beginning. A truck load of KC stuffs is indeed heavy duty
Hopefully your KC guy is not that KC company that kena bombard like crazy This post has been edited by RickOoi: Dec 29 2012, 05:13 PM |
|
|
|
|
|
Jan 1 2013, 05:47 PM
Return to original view | Post
#2
|
![]() ![]() ![]()
Junior Member
403 posts Joined: Jun 2008 From: Kuala Lumpur |
Wow! Nice! It does appeared bigger after the installation. Anyway, your kitchen is not by far small, it is huge.
|
|
|
Mar 13 2013, 12:45 PM
Return to original view | Post
#3
|
![]() ![]() ![]()
Junior Member
403 posts Joined: Jun 2008 From: Kuala Lumpur |
Hi Phoenix69, can share how much the 3 phase cost? Tq.
|
|
|
Mar 13 2013, 10:12 PM
Return to original view | Post
#4
|
![]() ![]() ![]()
Junior Member
403 posts Joined: Jun 2008 From: Kuala Lumpur |
QUOTE(phoenix69 @ Mar 13 2013, 09:41 PM) Here is my break down Hi Phoenix69, thanks for the prompt reply.TNB Connection charges (overhead type) - RM300.00 (Waived during special offer) Qualified Electrical contractor - RM800.00 (Might vary depending on diffrent contractor) Top up to TNB Deposit for 3 phase - RM200.00 I paid total RM1000.00 as the RM300.00 TNB connection charges was waived when I applied for 3 phase upgrade when there was a special offer. I called 1 of the TNB approved contractor, what he told me is the same as what you have stated. In addition, he mentioned that if there is any cabling to be done, it will be charged per meter basis. He did not mentioned how much is that. He said that the length of the cable depends on how far the meter from the 'tiang' but I am guessing he is talking about underground? Need to verify on this. If you don't mind, could you share with me your electrical contractor? I need to double check on the price. Thank you. |
|
|
Mar 15 2013, 10:00 PM
Return to original view | Post
#5
|
![]() ![]() ![]()
Junior Member
403 posts Joined: Jun 2008 From: Kuala Lumpur |
|
| Change to: | 0.0169sec
0.19
7 queries
GZIP Disabled
Time is now: 2nd December 2025 - 08:38 PM |