QUOTE(phoenix69 @ Mar 13 2013, 09:41 PM)
Here is my break down
TNB Connection charges (overhead type) - RM300.00 (Waived during special offer)
Qualified Electrical contractor - RM800.00 (Might vary depending on diffrent contractor)
Top up to TNB Deposit for 3 phase - RM200.00
I paid total RM1000.00
as the RM300.00 TNB connection charges was waived when I applied for 3 phase upgrade when there was a special offer.
It is amazing that you can just convert 1 phase to 3 phase with this change in panel. Is this for real? I scan other websites and they require a motor to convert, but it will result in efficiency loss e.g. http://www.tortech.com.au/category/single-...hase-converter/TNB Connection charges (overhead type) - RM300.00 (Waived during special offer)
Qualified Electrical contractor - RM800.00 (Might vary depending on diffrent contractor)
Top up to TNB Deposit for 3 phase - RM200.00
I paid total RM1000.00
as the RM300.00 TNB connection charges was waived when I applied for 3 phase upgrade when there was a special offer.
Mar 18 2013, 08:58 PM

Quote
0.0150sec
0.16
7 queries
GZIP Disabled