QUOTE(kingkong1 @ Jul 27 2011, 11:33 AM)
My contractor quote me RM3 psf for removing and levelling. Removing parque should be easy job. But levelling should cost more as there may be a lot of materials required to level the whole floor, not room by room. couple with higher floor. He told me he lost money charging RM2k for previous job.
My plan is use parque, if next time got 2nd phase only change the wardrop and flooring. Just to maintain the budget limit which already bloated.
my indon contractor only charge rm120 to remove my 200sft parque. However, one contractor did post this question.. he ask My plan is use parque, if next time got 2nd phase only change the wardrop and flooring. Just to maintain the budget limit which already bloated.
'why wanna remove when it's still nice? prices of wood has gone up. besides, laminated flooring isn't real wood'
kinda makes sense. So now i'm thinking whether it's worth the hoo haa to remove the parque which is still good.