it possible to install water pump direct after water meter??? with dry protection system and flow switch to prevent pump run dry.... tq
[WTA] Grundfos Water Pump, CH-PT or CH-PC
[WTA] Grundfos Water Pump, CH-PT or CH-PC
|
|
Feb 27 2016, 08:28 PM
Return to original view | Post
#1
|
![]()
Junior Member
7 posts Joined: Nov 2015 |
it possible to install water pump direct after water meter??? with dry protection system and flow switch to prevent pump run dry.... tq
|
|
|
Aug 27 2016, 09:14 AM
Return to original view | Post
#2
|
![]()
Junior Member
7 posts Joined: Nov 2015 |
|
|
|
Aug 29 2017, 10:32 PM
Return to original view | Post
#3
|
![]()
Junior Member
7 posts Joined: Nov 2015 |
QUOTE(sapphirejohn @ Jan 31 2014, 08:19 AM) For Malaysia, Water line in Malaysia need to be upgraded... It should 1inch from water header JBA until water meter at houses... But today only 1/2 inch or 3/4 inch... So the flow and pressure not enough... I think JBA need to replace it all...How many pipes are connected directly to the government service pipe? Only the kitchen sink? HOw abt ground floor bathroom? |
| Change to: | 0.0434sec
0.25
7 queries
GZIP Disabled
Time is now: 30th November 2025 - 11:42 PM |