QUOTE(papaya2 @ Mar 28 2011, 11:41 AM)
not include fitting the downlight and bulb, he say add extra rm5 per piece if u need they help.
yes, hacking the wall to concel the wire and plaster back but w/o paint the wall.
according to him, he use pcv or some kind of plastic tube to cover the wire and attached below my origin normal type ceiling and lay down to the downlight points' location.
He's not simply lay down the wire on top of paster ceiling, is this normal wire-man doing?
i'm still thinking and finding another cheaper contractor....

erm...i think the price is ok if they include wiring, hacking and plastering back the wire...
i found 1 contractor, RM35/downlight point (not included bulb n fitting)...but when i asked: is it include hacking and plastering? thhen he answered me : the wall is already there, how to hack??
so i think RM35 is not include hacking n plastering back...
may i know what kind of fitting u use? can share?
thank you