QUOTE(Eleganz Concept @ Mar 23 2011, 05:01 PM)
Just a simply go thru, is very sure that your RM50k is surely not enough, because the tiling work and extension work are already almost taking all already.
hi ElegBy the general calulation from below message, how much it will cost? and i will contact u (just recd ur PM) when i get the key. My hse 20x70 (grd floor fully build up)
Myplan is like below
1. Kitchen cement n tile top. Total ard 11 ft. Top n bottom cabinet.
2. Lighting will downlight (plaster ceiling ready)
3. Pining is needed.
Thanks
Joe
Apr 13 2011, 11:09 AM

Quote
0.0127sec
0.21
7 queries
GZIP Disabled