QUOTE(jojozep @ Sep 17 2011, 07:37 PM)
ha...ha also old bedhead...no time to do shopping..the original contractor caused me to spend another 40-50K..so was concentrating on the basic plumbing and water flow problems...had to break all the 3 bathrooms and my new tiles to redo all new plumbing again.....surprising...isn't it?
from old house, drawings, building, finished..
Wow... That's quite abit of work done. House looks excellent now.from old house, drawings, building, finished..
Sep 17 2011, 10:08 PM

Quote
0.0179sec
0.54
7 queries
GZIP Disabled