Shouldn't wetworks be done together with plumbing and electrical(with conduit)?
Sequence for plumbing and electical, - after wetworks?
Sequence for plumbing and electical, - after wetworks?
|
|
Jan 22 2011, 01:42 AM, updated 15y ago
Show posts by this member only | Post
#1
|
![]() ![]()
Junior Member
119 posts Joined: Sep 2008 |
Shouldn't wetworks be done together with plumbing and electrical(with conduit)?
|
|
|
Jan 22 2011, 10:34 AM
Show posts by this member only | Post
#2
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,705 posts Joined: Jan 2003 From: Planet Earth |
knocking and building new walls will go 1st, wiring and plumbing will go in the middle of it before they plaster the wall.
|
|
|
Jan 22 2011, 11:03 PM
Show posts by this member only | Post
#3
|
![]() ![]()
Junior Member
182 posts Joined: Jan 2009 |
i would say plumbing first (since there are 80% of hacking of walls for new pipe) but case on case basis. then wiring.....
|