I have booked type 1060sq early March, after visited Serin & Shaftbury..
Like the concept & design.. Went to the actual site visit with the SA,
SA told me that A3 & A4 will closely to the ERL track.. As u guys can see
that the phase 1 condo is in curve design so block A1 & A2 will avoid directly
facing the ERL track & highway..
Btw I still not yet apply for the loan, how about u guys??
Heard that SPA will only sign on May/June..
Mirage By The Lake, Cyberjaya, By OSK
Apr 7 2011, 03:05 PM
Quote
0.0142sec
0.35
7 queries
GZIP Disabled