its my turn to start the renovation since i got the key for a years and consider too long
and since im poor, no budget to hire ID, so i decide to do it by my self, looking for contractor one by one, and ask for quotation from each of them.
i try my best to reno for the part that really useful of it since my budget not allow me to do luxury reno
i divide the renovation part by part as following:
1) construction work(such as:cement, etc) - approx rm12k
- place cement at the place behind the house, (35X10)psft
- place cement at the place beside the car porch, b4 its lawn, (20X6)psft
- build up a store room at corner under staircase
- add one door at first floor master bedroom to belcony, b4 tat its window there
- add one concrete table top at dry kitchen, 11 feet
- add one concrete table top at wet kitchen, L shape, total 9 feet
- heighten the ditch border to prevent mug go into it, 60 feet
- enlarge main gate place, remove the pillar and re-build it at correct place
2) wiring
3) alarm
4) plaster ceiling
5) cabinet (kitchen, wardrobe, tv console, etc)
6) tinted
7) painting
8) auto gate system
9)grill door & window
10) maingate
11) plumbing
12)
these all already make me faint
, hope i can last until all the jobs done.
ori house b4 reno
Your house very nice... where is it?and since im poor, no budget to hire ID, so i decide to do it by my self, looking for contractor one by one, and ask for quotation from each of them.
i try my best to reno for the part that really useful of it since my budget not allow me to do luxury reno
i divide the renovation part by part as following:
1) construction work(such as:cement, etc) - approx rm12k
- place cement at the place behind the house, (35X10)psft
- place cement at the place beside the car porch, b4 its lawn, (20X6)psft
- build up a store room at corner under staircase
- add one door at first floor master bedroom to belcony, b4 tat its window there
- add one concrete table top at dry kitchen, 11 feet
- add one concrete table top at wet kitchen, L shape, total 9 feet
- heighten the ditch border to prevent mug go into it, 60 feet
- enlarge main gate place, remove the pillar and re-build it at correct place
2) wiring
3) alarm
4) plaster ceiling
5) cabinet (kitchen, wardrobe, tv console, etc)
6) tinted
7) painting
8) auto gate system
9)grill door & window
10) maingate
11) plumbing
12)
these all already make me faint
ori house b4 reno
I assume u should b very faint now..
I don't see anyway to do it below 60k, unless u want to make it kampung house..