QUOTE(celicacultus @ Jan 16 2011, 11:37 PM)
Fuego is a superlink, in a different category, moreover with lake & park/playground, living 2x2 tiles, 3 phase ... 10% difference is ok in my books.
IMHO, per sq ft calculation is the method used to justify for the constant price increase. Let's say 20x70 with built-up of 2170 sq ft at 620k, that's 285/sq ft. By year end, can launch another similar phase with 15% increase to reach 700k. I can hear the sales pitch : "Last phase of DSL, no more land already, material cost increase, mall near completion ... previous phase already at RM285/sq ft"
Some BBR intermediate DSL per sq ft comparison, based on the e-brochure on SD website :
Levena 22x75 2280sf RM468888 : 205
Petunia 20x65 1735sf RM456300 : 263
Paloma 24x75 2390sf RM488k : 204
Fuego 26x75 2445sf RM546k : 223
Something must be wrong with the info on Petunia on the brochure as I remember it was around 350k, maybe SD got some promo package.
Please correct if you know and update Ellis, Elana, Avira if you guys have the info, thank you.
if i am not mistaken Petunia was some RM336k, making it some RM194/sqft.IMHO, per sq ft calculation is the method used to justify for the constant price increase. Let's say 20x70 with built-up of 2170 sq ft at 620k, that's 285/sq ft. By year end, can launch another similar phase with 15% increase to reach 700k. I can hear the sales pitch : "Last phase of DSL, no more land already, material cost increase, mall near completion ... previous phase already at RM285/sq ft"
Some BBR intermediate DSL per sq ft comparison, based on the e-brochure on SD website :
Levena 22x75 2280sf RM468888 : 205
Petunia 20x65 1735sf RM456300 : 263
Paloma 24x75 2390sf RM488k : 204
Fuego 26x75 2445sf RM546k : 223
Something must be wrong with the info on Petunia on the brochure as I remember it was around 350k, maybe SD got some promo package.
Please correct if you know and update Ellis, Elana, Avira if you guys have the info, thank you.
Added on January 17, 2011, 8:49 am
QUOTE(AVFAN @ Jan 17 2011, 05:49 AM)
valid question...
check the specs, maybe lower - usual things are tiles, single or 3phase wiring, sanitary wares, other costs like agreements/stamp duty incl or not.
how close to main road, traffic flow, potential noise and air pollution are also factors.
faster incr in rmpsf in one place mean more aggressive dev.
judging at the location of the new Avani, it is already on the losing end compared to any of the superlink of Paloma and Fuego. The location of superlink is much convenient to reach, close to the future shoplots, not so close to the Shapadu hiway and close to lake as well. Perhaps these are the points that shoot up the price compared to the recent Avani launching next week.check the specs, maybe lower - usual things are tiles, single or 3phase wiring, sanitary wares, other costs like agreements/stamp duty incl or not.
how close to main road, traffic flow, potential noise and air pollution are also factors.
faster incr in rmpsf in one place mean more aggressive dev.
My wife sudah bising kept banging me beli Fuego after she saw the actual location....S&P to be signed today.....so I will one of neighbor in Fuego too.....cheers!
This post has been edited by ken7908: Jan 17 2011, 08:49 AM
Jan 17 2011, 08:43 AM

Quote
0.0466sec
0.37
7 queries
GZIP Disabled