Welcome Guest ( Log In | Register )

Outline · [ Standard ] · Linear+

 BANDAR NUSAPUTRA, Cyberjaya locality at Puchong price

views
     
kkgooi
post Feb 7 2012, 03:03 PM

New Member
*
Junior Member
9 posts

Joined: Feb 2012
QUOTE(mms360 @ Feb 6 2012, 07:39 PM)
Hi,

I am also a spazio owner. Your unit must be the one facing the Grande row. I bought a unit facing the behind and just went to collect my keys last Sat. Can you imagine that the finishings are not done yet? I am so frustrated and practically went off without inspecting anything.

Just wondering when you bought your unit as I am not aware of zero loan interest during construction. Would you mind to elaborate further? When I bought my unit in August last year, I was not made aware of the zero loan interest scheme.

Also, is there any avenue to complain about non-completion of the house after collecting keys?

Thanks.
*
i'm also spazio owner. i collected the keys but the house is totally not complete!

Alot of defects and incomplete jobs like toilet leaking, laminate flooring not install, air cond pipe not install, ground floor aircond pipe is not compatible for 2HP aircond, the location to store the aircond outdoor unit is not enough to install 2hp outdoor unit, no power point at washing area, roof leaking, the dining area fan point not at center and is not able to install any ceiling fan, WC and Basin not install yet, tiles cracks, lighting point at kitchen is not at center and many more.

Actually i need to hand over my current house to the new buyer but too bad the Developer still cannot complete my units. I really disappointing with them. They should pay the interest as per their promise until they really can hand over.

I think we should gather and have a meeting with the developer to ask for compensation!
kkgooi
post Feb 9 2012, 09:03 AM

New Member
*
Junior Member
9 posts

Joined: Feb 2012
What time to meet there? i'm fine
kkgooi
post Feb 10 2012, 04:55 PM

New Member
*
Junior Member
9 posts

Joined: Feb 2012
See you at 10am tomorrow

This post has been edited by kkgooi: Feb 10 2012, 05:33 PM
kkgooi
post Feb 14 2012, 12:08 PM

New Member
*
Junior Member
9 posts

Joined: Feb 2012
QUOTE(felixwang @ Feb 13 2012, 05:36 PM)
Did anyone turns up for the meeting?
*
yes 3 owners of Spazio turn up and have a good discussion. Are you spazio owner?
kkgooi
post Feb 22 2012, 09:03 PM

New Member
*
Junior Member
9 posts

Joined: Feb 2012
QUOTE(BuLLs10 @ Feb 18 2012, 12:10 PM)
btw, do you guys has any contractor contact? doing piping , electrician and others? if got pls pm me their contact.
*
I'm finalize my contractor for minor renovation work on this saturday afternoon time. If you free you can come and check it out with my contractor.
kkgooi
post Feb 25 2012, 12:39 AM

New Member
*
Junior Member
9 posts

Joined: Feb 2012
QUOTE(mms360 @ Feb 23 2012, 11:02 AM)
PMed you.


Added on February 23, 2012, 11:04 am

What time?
*
I will be there about 3pm


Added on February 25, 2012, 12:51 amI found 2 more structure or design defects:

1) there is no floor trap in the bath 2 and 3 after they install the shower screen. I already make note to them but they said that is the design. I think this is not right and they need to make a floor trap at the basin and wc area. If u wash your toilet the basin and wc area will be flooded with water. The suggestion from them is they will leave a gap between the floor and shower screen so the water will flow thru the gap. I CANNOT accept it because the gap there will be very dirty and unhygiene.

2) rain water will splash and leaking from the upstairs familiy area windows(the acces to tangki area)

Please check your area and feel free to input your comments

This post has been edited by kkgooi: Feb 25 2012, 12:51 AM
kkgooi
post Mar 3 2012, 08:33 AM

New Member
*
Junior Member
9 posts

Joined: Feb 2012
QUOTE(ole_solskjaer @ Mar 3 2012, 01:06 AM)
Ive installed the shower screens too and is facing this problem as well..my contractor auggested da same solution but i do agree its un acceptable..

For prob no2, if heavy rains, it will splash into the family area too..i think its kinda ignorant tht the developer dint think tht it wud splash into the family are..and the windows are fixed permanently..
*
The developer is totally can solve all the defects. There is more and more leaking problem will come when you install the water meter. You may get the water meter from the management office and supply the water to your house. You may see more leaking problem.

I really disappointed with that kind of lousy workmanship!!!


Added on March 3, 2012, 8:39 amI took my Key on 16 January 2013 and until now there is no TNB meter!!!! i think this is ridiculous. i'm planing to move in on 18 March but i think with more leaking problem after install the water meter is going to be delayed.



This post has been edited by kkgooi: Mar 3 2012, 08:39 AM
kkgooi
post Mar 9 2012, 04:35 PM

New Member
*
Junior Member
9 posts

Joined: Feb 2012
QUOTE(sewerside @ Mar 8 2012, 02:31 AM)
Hi guys, according to a saleperson of an electrical shop, if the house already have air-cond pipe and wiring, it cannot support Inverter air-cond due to something to do with inverter need to have bigger pipe.

Is this true?

Also, anyone know how much an air-cond installation would be if our house already have wiring and pipe?
*
the existing aircond pipe doesn't support Panasonic inverted aircond but u can go for Daikin inverted aircond. i already book the aircond.
kkgooi
post Mar 20 2012, 11:50 PM

New Member
*
Junior Member
9 posts

Joined: Feb 2012
QUOTE(publicbank66 @ Mar 15 2012, 01:06 AM)
Bro, whats ur opinion on this developer? as i thought of buying reflexion on this coming sat..
*
Do not buy the developer suck!
i'm regreted!

 

Change to:
| Lo-Fi Version
0.0260sec    0.82    7 queries    GZIP Disabled
Time is now: 9th December 2025 - 01:28 PM