Welcome Guest ( Log In | Register )

Outline · [ Standard ] · Linear+

Streamyx Pakej Jalur Lebar TM dgn Komputer 1Malaysia, Another streamyx package with netbook

views
     
isma45
post Jun 5 2010, 10:04 PM

- rocking the highway -
****
Senior Member
582 posts

Joined: Jun 2009
have any1 received the so called komputer 1 malaysia??

pff..sounds ugly la..later when najib no more pm then 1 malaysia gone..

same like gemilang cemerlang terbilang..pff
isma45
post Jul 23 2010, 09:22 AM

- rocking the highway -
****
Senior Member
582 posts

Joined: Jun 2009
guys...need help..fyi, i am eligible to apply for this package..and already registered with tm point on 5th july 2010...but when i checked on the mips site, my status of new package registration was not even stated there..and it still shows my current stremyx package... does anyone experience like this before?

isma45
post Jul 23 2010, 09:36 AM

- rocking the highway -
****
Senior Member
582 posts

Joined: Jun 2009
QUOTE(steventan85 @ Jul 23 2010, 09:24 AM)
did the tmpoint give u any confirmation slip for ur registration ? if no , pls go back the tmpoint and ask again
*
yes. so what can i do with the slip?
isma45
post Jul 23 2010, 09:47 AM

- rocking the highway -
****
Senior Member
582 posts

Joined: Jun 2009
QUOTE(steventan85 @ Jul 23 2010, 09:43 AM)
meaning they have key ur info into the TM system d... pls go back and check with TM point about ur registration

ask them when can it be done ..
*
hmm...do u mean what they key in the tm system not shown yet in this site?

https://mips.tm.net.my/SelfCare/SelfcareMain.jsp

i tawt what they keyed in should be shown in the mips site..
isma45
post Jul 23 2010, 10:01 AM

- rocking the highway -
****
Senior Member
582 posts

Joined: Jun 2009
QUOTE(steventan85 @ Jul 23 2010, 09:50 AM)
yes , once they gave u the confirmation slip , ur info should be straight away key into the TM system d... no way u cant get it at MIPS till now ... pls walk in and ask them smile.gif
*
ok bro..thanks for your info..
isma45
post Jul 24 2010, 11:22 PM

- rocking the highway -
****
Senior Member
582 posts

Joined: Jun 2009
QUOTE(steventan85 @ Jul 23 2010, 09:50 AM)
yes , once they gave u the confirmation slip , ur info should be straight away key into the TM system d... no way u cant get it at MIPS till now ... pls walk in and ask them smile.gif
*
hey all..is it true that this package in ONLY for new application??

today morning i went to TM authorized dealer who process my application..
i ask them y my application stil not shown in mips..
they show me the application waiting list..they actually have key in my application on 5th July 2010..
they told me to ask TM point for mips status..

later i went to TM point..
i ask the guy there..he quickly shoot down me n said this package is ONLY for new application.. vmad.gif
lucky he check my place is eligible to apply..
damn sad.. cry.gif sad.gif

anyway..my current contract with tmnet are 2 months left.. icon_rolleyes.gif
after finish sure i will terminate my package n re apply for this 1 malaysia package..
hope the package is still available tho..erghhh rclxub.gif
isma45
post Jul 26 2010, 09:42 AM

- rocking the highway -
****
Senior Member
582 posts

Joined: Jun 2009
QUOTE(aeqeos @ Jul 25 2010, 11:28 AM)
i apply at tm point kota bharu,kelantan..submit form 23 june and upgrade success 15 july..
*
damn effective...ure very lucky...im eager to have 4mbs (if available) but 1mbs also fine for me...
whats wrong in giving people upgrade if they r eligible??? arghhhh
tmnet sucks vmad.gif
isma45
post Sep 3 2010, 04:02 PM

- rocking the highway -
****
Senior Member
582 posts

Joined: Jun 2009
=( sigh... i applied for this package on 4th of july...now its 4th of september...
i went to TMAD last 30 august n they told me my application still pending for approval..=(

im very2 dissapointed with the service shown by tm kajang or bangi or big TM itself.. does anyone know where can i lodged report??? cry.gif

This post has been edited by isma45: Sep 3 2010, 04:15 PM
isma45
post Sep 4 2010, 12:16 AM

- rocking the highway -
****
Senior Member
582 posts

Joined: Jun 2009
QUOTE(raksaser @ Sep 3 2010, 05:27 PM)
they still didnt install the phone line ke?
*
i already have phone line...the last update i received was 2 weeks ago when they call me to get line install at my house. but i told them my house oredy hav phone line..n dats all...no news until now.. cry.gif
isma45
post Sep 4 2010, 10:13 AM

- rocking the highway -
****
Senior Member
582 posts

Joined: Jun 2009
QUOTE(kurtkob78 @ Sep 4 2010, 01:18 AM)
dont you call them or follow up with them ?
*
i already went to TAD last 30th n they said my application still pending for approval.. theres 5-6 other applicants like me...
but reading all those success applicant replies here makes me wonder y the TM folks at my area r super2 slow... rclxub.gif
isma45
post Sep 8 2010, 11:23 PM

- rocking the highway -
****
Senior Member
582 posts

Joined: Jun 2009
QUOTE(lms2005 @ Sep 6 2010, 03:23 PM)
u very lucky lo..

i apply on 15th June, pon install on July 20th. Still pending... mips also dun hv record...  vmad.gif

they want me use 1515  shakehead.gif
*
so now its u la whos lucky... cry.gif

damnnnn....so u reg on 15 june..like me reg on july..mayb my turn is next month...sigh!! rclxub.gif
isma45
post Sep 9 2010, 03:37 PM

- rocking the highway -
****
Senior Member
582 posts

Joined: Jun 2009
QUOTE(lms2005 @ Sep 9 2010, 02:59 PM)
i rajin call 100.

dun tell them u subscribe 1 malaysia
*
if i didnt tell, then wat to say to 100?

 

Change to:
| Lo-Fi Version
0.0352sec    0.34    7 queries    GZIP Disabled
Time is now: 5th December 2025 - 12:31 AM