The story start like this:-
Initial he job are doing very good and prof way, but once it extentin til second floor, I start noticed problem as the wall a bit slip a side and I has have warmed him and lucky about to get it correct.
After than I have more caustion and end up more correction require lol.
The explore happen when it came to the front gate pillar, as instead of build through concreate it just use brick for the two pillar, hence I contact the gate folk to check whether it could suitain my gate or not (I'm ordering 16F gate), and been advise better use concreate due to the gate size, and normally the fault area is the connector between pillar and gate which causing problem due to the build of pillar. So I have ask the contrator redo the whole thing else I will not pay him. Sure he will *&&^%^*.
After he redo, I noticed that from side view (pillar to pillar), the one whole the dushband is more front than another, hence I complained again and he have to re-cememat the whole thing again...after he done it and it look fine again.
Few weeks later while I discussed with next door, and next door asking my "Adik, why you pillar build funny and side one side?", I ask what you meant? than only noticed from pillar look into the house, it not a line and it go to the door. I used the measurement tape and check. What the hack, front pillar 6 in and back pillar 9 inch, sure it look funny. Than when I complained, guess what answer I got....
After the incident a week, I told him I will put the tiles and paint out from him ...
Today when he called up for the settlement, and told me him done this / that, need charge and so on and all rubbish talk....and basically want extra 1K just to settle the claimed I charge back to him due to the concreate leaking task that I informed him and he claimed not free, and agreed me to ask Indo to get it solve....
So member here, learnning point is
1) Get Black and white and itemize down what the jobs is
2) Even a small task that is agreed FOC or charge, wrote it down
3) review every 2 weeks on the agreement
4) Cheap not meant Good and may need pay extra more just like me...(Extra almost 10K to clear "Shit" for him by other)
Why I pay the extra? 1) With extra 1K I didn't need to have nightmate what he will do 2) 1K to know a guy is expensive but someone is also a good news
COmpany name: Walmxx contriction
Name: Wong xx
Phone: 016-3924xxx / 016 - 3611xxx
Base: Serdang
Initial is a good guy but endup is another joker.
This post has been edited by Jo_da48: Aug 16 2011, 12:52 AM
Aug 13 2011, 12:07 AM
Quote
0.0234sec
0.71
7 queries
GZIP Disabled