I think the only option is to cut out the electricity by TNB to educate this fellas to make them understand what is earth hour.
EARTH DESTRUCTION HOUR: 8.30PM-9:30PM, 26/3/2011, Switch ON EVERYTHING! | We Did It Again! Group
EARTH DESTRUCTION HOUR: 8.30PM-9:30PM, 26/3/2011, Switch ON EVERYTHING! | We Did It Again! Group
|
|
Mar 21 2010, 12:27 PM
Return to original view | Post
#1
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,020 posts Joined: Jul 2005 From: Neverland |
I think the only option is to cut out the electricity by TNB to educate this fellas to make them understand what is earth hour.
|
|
|
Mar 21 2010, 01:04 PM
Return to original view | Post
#2
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,020 posts Joined: Jul 2005 From: Neverland |
QUOTE(soundsyst64 @ Mar 21 2010, 12:36 PM) if make earth hour effective, TNB should shut down their main power source so nationwide will be left in total darkness for an hour. let's see if people including namewee raeegg. Trust me, in /k/ itself we have unnumbered bunch of namewees. U will see the replies after this, then we shall count.http://en.wikipedia.org/wiki/1996_Peninsul...blackout_crisis The 1996 Peninsular Malaysia electricity blackout crisis was a power outage in Malaysia. It occurred at 17:17 on 3 August 1996. The whole of Peninsular Malaysia including Kuala Lumpur, Selangor, Putrajaya, Johor, Malacca and Negri Sembilan plunged into darkness for several hours. A transmission line near Sultan Ismail Power Station in Paka, Terengganu tripped at 5:17pm causing all power stations in Peninsular Malaysia to collapse resulting in a massive power failure. Supply was back to normal by 11pm.[1] |
| Bump Topic Add ReplyOptions New Topic |
| Change to: | 0.0124sec
0.51
6 queries
GZIP Disabled
Time is now: 8th December 2025 - 08:30 PM |