Outline ·
[ Standard ] ·
Linear+
Contacts for Contractors, Contacts Needed
|
TSGreenyz
|
Oct 29 2009, 10:10 PM, updated 17y ago
|
Getting Started

|
I am going to get my house key soon, meaning its time to start shopping around,finalising details and compare prices. I need recommendation for these few areas, fellow forumers hope you can help/assist me in the followings: 1) Painter 2) Wireman/Electrical Guy 3) Plumbing 4) Plaster Ceiling/renovation(floor and wall tiles) and etc Kindly share with me your contacts .Hope to get a trustworthy and good price Many thanks in advance
|
|
|
|
|
|
sam0919
|
Oct 29 2009, 10:32 PM
|
|
do u need some1 to do ur house interior design?
|
|
|
|
|
|
skng03
|
Oct 29 2009, 11:43 PM
|
|
do u need some1 to contract your house reno.??
|
|
|
|
|
|
TSGreenyz
|
Oct 30 2009, 09:00 PM
|
Getting Started

|
QUOTE(skng03 @ Oct 29 2009, 11:43 PM) do u need some1 to contract your house reno.?? Nope if can I want those 4 to be separate person ... I will be the one supervising.. This way I could control everything and most important do things the way I like This post has been edited by Greenyz: Oct 30 2009, 09:00 PM
|
|
|
|
|
|
jarjar6666
|
Oct 30 2009, 10:23 PM
|
|
I've pmed u.
|
|
|
|
|
|
Chester
|
Oct 31 2009, 12:04 AM
|
|
got painter to intro?
|
|
|
|
|
|
kons
|
Oct 31 2009, 07:22 AM
|
Конс
|
QUOTE(Greenyz @ Oct 30 2009, 09:00 PM) Nope if can I want those 4 to be separate person ... I will be the one supervising.. This way I could control everything and most important do things the way I like All stuff up there are pretty related to one another, like wiring and plaster ceiling would need to work together, and tilings too. if you simply get anyone out there and somehow the wiring guy and the plaster ceiling guy has personal grudge against one another, or the tiling can only be done after the wiring is complete, but the wiring is taking too long but the tiling guy can't wait, etc. You can control everything even when there is a supervisor, note that the supervisor control them, but you control the supervisor.
|
|
|
|
|
|
TSGreenyz
|
Nov 1 2009, 07:07 AM
|
Getting Started

|
QUOTE(jarjar6666 @ Oct 30 2009, 10:23 PM) will check it out ..TQ for intro Added on November 1, 2009, 7:07 amQUOTE(kons @ Oct 31 2009, 07:22 AM) All stuff up there are pretty related to one another, like wiring and plaster ceiling would need to work together, and tilings too. if you simply get anyone out there and somehow the wiring guy and the plaster ceiling guy has personal grudge against one another, or the tiling can only be done after the wiring is complete, but the wiring is taking too long but the tiling guy can't wait, etc. You can control everything even when there is a supervisor, note that the supervisor control them, but you control the supervisor. Tq for d feedback This post has been edited by Greenyz: Nov 1 2009, 07:07 AM
|
|
|
|
|
|
dvinez
|
Nov 10 2009, 05:34 PM
|
|
sent u contact, if u still need it.
|
|
|
|
|
|
TSGreenyz
|
Nov 10 2009, 08:27 PM
|
Getting Started

|
QUOTE(dvinez @ Nov 10 2009, 05:34 PM) sent u contact, if u still need it. Thanks mate ...
|
|
|
|
|