QUOTE(dvinez @ Jun 18 2009, 06:37 PM)
Bros/Sis/Pros,
I'm going to change my gate, build car porch, change doors, change windows, change floor tiles, change ceilling, paint the whole house, extension on the back for a toilet, and put tiles and cement on my lubang stair.
I asked 2 contractor to bundle those and their price are quite high.
So I want to separate each job for different contractor for better budget.
However I dont know how to do it, call them at once and let them figure it out ?
Or I should call the one who do the extension first, then tiles or windows, step by step ?
Any advice or guidance ? Thanks !
how much they quote you ? looks like a lot of work to be doneI'm going to change my gate, build car porch, change doors, change windows, change floor tiles, change ceilling, paint the whole house, extension on the back for a toilet, and put tiles and cement on my lubang stair.
I asked 2 contractor to bundle those and their price are quite high.
So I want to separate each job for different contractor for better budget.
However I dont know how to do it, call them at once and let them figure it out ?
Or I should call the one who do the extension first, then tiles or windows, step by step ?
Any advice or guidance ? Thanks !