Welcome Guest ( Log In | Register )

17 Pages « < 6 7 8 9 10 > » Bottom

Outline · [ Standard ] · Linear+

Investment Atmosfera Condominium, Puchong Jaya

views
     
Chunkit9
post Apr 26 2012, 02:29 PM

Casual
***
Junior Member
324 posts

Joined: Feb 2012
QUOTE(uglytwl @ Apr 26 2012, 02:19 PM)
I think he means RM360-RM370 per square feet.
*
ohhh ok ok.. thanks thanks..
Darian28
post Apr 26 2012, 11:22 PM

New Member
*
Junior Member
41 posts

Joined: Feb 2012
Atmosfera unit for sale. Unit come with minimal furnish on 1st floor for 1282sf and 1455sf.

Anyone interested can pm me. Tks
cloner
post Apr 27 2012, 12:19 AM

Regular
******
Senior Member
1,101 posts

Joined: Jan 2006


450-550k segment ?

This post has been edited by cloner: Apr 27 2012, 12:20 AM
Dranzer
post May 9 2012, 01:44 PM

New Member
*
Junior Member
20 posts

Joined: Sep 2006
yes now there selling Rm357.00 to 375.00 per sqft. So for the smallest unit there will be RM460k to 480k. Interested buyer can call me. 017-6749734 Thanks

This post has been edited by Dranzer: May 9 2012, 01:45 PM
Chunkit9
post May 21 2012, 09:49 AM

Casual
***
Junior Member
324 posts

Joined: Feb 2012
to all atmosfera owner, believe you guys get your key...

so far any complain??
Falangkei
post May 21 2012, 02:38 PM

Getting Started
**
Junior Member
105 posts

Joined: Jan 2011
QUOTE(Chunkit9 @ May 21 2012, 09:49 AM)
to all atmosfera owner, believe you guys get your key...

so far any complain??
*
I already posted in zefer hill..
Chunkit9
post May 21 2012, 03:26 PM

Casual
***
Junior Member
324 posts

Joined: Feb 2012
QUOTE(Falangkei @ May 21 2012, 02:38 PM)
I already posted in zefer hill..
*
ya ya.. i read... that why post here again to see other user complain..

my sis received a sms saying there are some contractor gangster that block any other contractor to do reno.. must choose thier own contractor for reno..
is that true??
lionking331
post May 21 2012, 04:17 PM

Getting Started
**
Junior Member
90 posts

Joined: Jul 2010
QUOTE(Chunkit9 @ May 21 2012, 03:26 PM)
ya ya.. i read... that why post here again to see other user complain..

my sis received a sms saying there are some contractor gangster that block any other contractor to do reno.. must choose thier own contractor for reno..
is that true??
*
i though this only happen in penang? shakehead.gif how come here also got this problem? anybody can share izzit true?
jandrew
post May 21 2012, 06:53 PM

New Member
*
Junior Member
20 posts

Joined: Feb 2012
QUOTE(Dranzer @ May 9 2012, 01:44 PM)
yes now there selling Rm357.00 to 375.00 per sqft. So for the smallest unit there will be RM460k to 480k. Interested buyer can call me. 017-6749734 Thanks
*
1st floor?
Dranzer
post May 21 2012, 10:09 PM

New Member
*
Junior Member
20 posts

Joined: Sep 2006
got more then 3th floor and above. If u interested can call me for viewing. Thanks. 017-6749734
yunashiwa
post May 25 2012, 10:53 AM

New Member
*
Newbie
3 posts

Joined: May 2012


Hi Falangkei. I've read your comments on the defects in your atmosfera unit. I've got the same issue if not more!

Gotta say that I'm quite disappointed with the finishing touches. My unit didn't even have the main door installed yet!! I don't understand how they can get clearance from government to release the unit to us buyers.

The unit is in a total mess right now. They gave me the whole bunch of keys to my unit. But I need to use NONE of them to go inside my unit as there is no door! The reason they give me is because Bomba request that they change the door to fire rated door for corner units cause the units are located further away from the lifts. Ok. But why cant they do it before giving us the permission to get the keys? I've paid everything in full in order to get the keys! But unfortunely I can't start installing lights or fans and air cons because there's no door to my unit. Who's gonna be responsible if things are stolen from my unit?

I've had lots of a issues with the finishing touches. When I said lots I mean LOTS!! I've counted to at least 200+ wall defects, ie. holes, cracks, unpaint, rough surface, etc. they took me a whole day to mark them all! There are a lot of unfilled gaps in between tiles. Especially on the edges, ie. the link from wall to floor. Some of the window railings are rotted. There are huge gaps on closed room doors, big enough for an iguana to squeeze through, (exaggerate a bit la). And the whole unit is super dirty. Windows are covered in splashed paints, paints all over the tiles, dripping down from the wall i supposed. I mean, arent they suppose to give us a FIT to stay unit? Who's buying a construction site to stay? But Man.. I really have no idea when can I "settle" all those before I can start renovating/installing lightings.

The management told me that they need AT LEAST another 2 weeks to get the door installed. And from then AT LEAST another month to look into all the defects I mentioned. Read carefully, AT LEAST... According to the man in charge, I don't know what he does but I know we are suppose to submit the defect list to him, he's got an office at the ground floor of the Kondo in block A. He also told me that it's better for me to submit the defect list after they've install the door. But when I asked him yesterday about the time they need once I submit the defect list to get the things done, he said if I submitted yesterday I'll be 56th on the waiting list. 56th??!! I don't think they can kaotim a unit in a day. So for sure I won't get the defects ratified in a month! That's for sure. And if I submit the defect list after the door is installed, I would be what? 356th on the waiting list? I mean come on!!

How can you collect money from me and telling me that the unit is FIT to occupy? Make no sense at all man.

Guys whoever you are. What do you suggest me to do? I just want to get the things done and move on! Time is essence. No point complain here and there and get no further from the problem I already have.

Gotta say, disappointing. I really do. We are paying good money for things like that..

P/S: I noticed that some of the room doors have these weird holes on the side. I guess they accidentally drill the wholes on the wrong side of the door and the just simply amend it by filling the holes and painted it to cover up. Should I request to replace the doors or is it normal to do that way? Cause the last time I check a door can cost a few hundreds. I mean I've already paid so much for the Kondo. Takkan I wanna buy some defect??

Gosh. The more I type the the more fire I get.
1282009
post May 25 2012, 11:04 AM

Look at all my stars!!
*******
Senior Member
4,229 posts

Joined: Jan 2009
QUOTE(yunashiwa @ May 25 2012, 10:53 AM)
Hi Falangkei. I've read your comments on the defects in your atmosfera unit. I've got the same issue if not more!

Gotta say that I'm quite disappointed with the finishing touches. My unit didn't even have the main door installed yet!! I don't understand how they can get clearance from government to release the unit to us buyers.

The unit is in a total mess right now. They gave me the whole bunch of keys to my unit. But I need to use NONE of them to go inside my unit as there is no door! The reason they give me is because Bomba request that they change the door to fire rated door for corner units cause the units are located further away from the lifts. Ok. But why cant they do it before giving us the permission to get the keys? I've paid everything in full in order to get the keys! But unfortunely I can't start installing lights or fans and air cons because there's no door to my unit. Who's gonna be responsible if things are stolen from my unit?

I've had lots of a issues with the finishing touches. When I said lots I mean LOTS!! I've counted to at least 200+ wall defects, ie. holes, cracks, unpaint, rough surface, etc. they took me a whole day to mark them all! There are a lot of unfilled gaps in between tiles. Especially on the edges, ie. the link from wall to floor. Some of the window railings are rotted. There are huge gaps on closed room doors, big enough for an iguana to squeeze through, (exaggerate a bit la). And the whole unit is super dirty. Windows are covered in splashed paints, paints all over the tiles, dripping down from the wall i supposed. I mean, arent they suppose to give us a FIT to stay unit? Who's buying a construction site to stay? But Man.. I really have no idea when can I "settle" all those before I can start renovating/installing lightings.

The management told me that they need AT LEAST another 2 weeks to get the door installed. And from then AT LEAST another month to look into all the defects I mentioned. Read carefully, AT LEAST... According to the man in charge, I don't know what he does but I know we are suppose to submit the defect list to him, he's got an office at the ground floor of the Kondo in block A. He also told me that it's better for me to submit the defect list after they've install the door. But when I asked him yesterday about the time they need once I submit the defect list to get the things done, he said if I submitted yesterday I'll be 56th on the waiting list. 56th??!! I don't think they can kaotim a unit in a day. So for sure I won't get the defects ratified in a month! That's for sure. And if I submit the defect list after the door is installed, I would be what? 356th on the waiting list? I mean come on!!

How can you collect money from me and telling me that the unit is FIT to occupy? Make no sense at all man.

Guys whoever you are. What do you suggest me to do? I just want to get the things done and move on! Time is essence. No point complain here and there and get no further from the problem I already have.

Gotta say, disappointing. I really do. We are paying good money for things like that..

P/S: I noticed that some of the room doors have these weird holes on the side. I guess they accidentally drill the wholes on the wrong side of the door and the just simply amend it by filling the holes and painted it to cover up. Should I request to replace the doors or is it normal to do that way? Cause the last time I check a door can cost a few hundreds. I mean I've already paid so much for the Kondo. Takkan I wanna buy some defect??

Gosh. The more I type the the more fire I get.
*
200+ defects are a lot. Last time mine is 30+. I think for the room door with holes, u should list as another defect.


calcom21
post May 27 2012, 08:25 AM

Getting Started
**
Junior Member
123 posts

Joined: May 2006
QUOTE(yunashiwa @ May 25 2012, 10:53 AM)
Hi Falangkei. I've read your comments on the defects in your atmosfera unit. I've got the same issue if not more!

Gotta say that I'm quite disappointed with the finishing touches. My unit didn't even have the main door installed yet!! I don't understand how they can get clearance from government to release the unit to us buyers.

The unit is in a total mess right now. They gave me the whole bunch of keys to my unit. But I need to use NONE of them to go inside my unit as there is no door! The reason they give me is because Bomba request that they change the door to fire rated door for corner units cause the units are located further away from the lifts. Ok. But why cant they do it before giving us the permission to get the keys? I've paid everything in full in order to get the keys! But unfortunely I can't start installing lights or fans and air cons because there's no door to my unit. Who's gonna be responsible if things are stolen from my unit?

I've had lots of a issues with the finishing touches. When I said lots I mean LOTS!! I've counted to at least 200+ wall defects, ie. holes, cracks, unpaint, rough surface, etc. they took me a whole day to mark them all! There are a lot of unfilled gaps in between tiles. Especially on the edges, ie. the link from wall to floor. Some of the window railings are rotted. There are huge gaps on closed room doors, big enough for an iguana to squeeze through, (exaggerate a bit la). And the whole unit is super dirty. Windows are covered in splashed paints, paints all over the tiles, dripping down from the wall i supposed. I mean, arent they suppose to give us a FIT to stay unit? Who's buying a construction site to stay? But Man.. I really have no idea when can I "settle" all those before I can start renovating/installing lightings.

The management told me that they need AT LEAST another 2 weeks to get the door installed. And from then AT LEAST another month to look into all the defects I mentioned. Read carefully, AT LEAST... According to the man in charge, I don't know what he does but I know we are suppose to submit the defect list to him, he's got an office at the ground floor of the Kondo in block A. He also told me that it's better for me to submit the defect list after they've install the door. But when I asked him yesterday about the time they need once I submit the defect list to get the things done, he said if I submitted yesterday I'll be 56th on the waiting list. 56th??!! I don't think they can kaotim a unit in a day. So for sure I won't get the defects ratified in a month! That's for sure. And if I submit the defect list after the door is installed, I would be what? 356th on the waiting list? I mean come on!!

How can you collect money from me and telling me that the unit is FIT to occupy? Make no sense at all man.

Guys whoever you are. What do you suggest me to do? I just want to get the things done and move on! Time is essence. No point complain here and there and get no further from the problem I already have.

Gotta say, disappointing. I really do. We are paying good money for things like that..

P/S: I noticed that some of the room doors have these weird holes on the side. I guess they accidentally drill the wholes on the wrong side of the door and the just simply amend it by filling the holes and painted it to cover up. Should I request to replace the doors or is it normal to do that way? Cause the last time I check a door can cost a few hundreds. I mean I've already paid so much for the Kondo. Takkan I wanna buy some defect??

Gosh. The more I type the the more fire I get.
*


Bro, yes indeed there is a lot of defects. But some of it is not true. Installation of the fire rated door, yes.. probably 1-2 weeks time. Defect AT LEAST 1 month? no way... do check on your s&p. Max they need to rectified within 1 month. not at least. it's from the date you submit your defect checklist. but if you got time to go check it out regularly.. as they might hold it till a week or so then start fixing ur parts and u dowan them to fix it "cing cai" for you...

findingpeace
post May 28 2012, 04:54 PM

New Member
*
Newbie
3 posts

Joined: May 2012
QUOTE(yunashiwa @ May 25 2012, 10:53 AM)
Hi Falangkei. I've read your comments on the defects in your atmosfera unit. I've got the same issue if not more!

Gotta say that I'm quite disappointed with the finishing touches. My unit didn't even have the main door installed yet!! I don't understand how they can get clearance from government to release the unit to us buyers.

The unit is in a total mess right now. They gave me the whole bunch of keys to my unit. But I need to use NONE of them to go inside my unit as there is no door! The reason they give me is because Bomba request that they change the door to fire rated door for corner units cause the units are located further away from the lifts. Ok. But why cant they do it before giving us the permission to get the keys? I've paid everything in full in order to get the keys! But unfortunely I can't start installing lights or fans and air cons because there's no door to my unit. Who's gonna be responsible if things are stolen from my unit?

I've had lots of a issues with the finishing touches. When I said lots I mean LOTS!! I've counted to at least 200+ wall defects, ie. holes, cracks, unpaint, rough surface, etc. they took me a whole day to mark them all! There are a lot of unfilled gaps in between tiles. Especially on the edges, ie. the link from wall to floor. Some of the window railings are rotted. There are huge gaps on closed room doors, big enough for an iguana to squeeze through, (exaggerate a bit la). And the whole unit is super dirty. Windows are covered in splashed paints, paints all over the tiles, dripping down from the wall i supposed. I mean, arent they suppose to give us a FIT to stay unit? Who's buying a construction site to stay? But Man.. I really have no idea when can I "settle" all those before I can start renovating/installing lightings.

The management told me that they need AT LEAST another 2 weeks to get the door installed. And from then AT LEAST another month to look into all the defects I mentioned. Read carefully, AT LEAST... According to the man in charge, I don't know what he does but I know we are suppose to submit the defect list to him, he's got an office at the ground floor of the Kondo in block A. He also told me that it's better for me to submit the defect list after they've install the door. But when I asked him yesterday about the time they need once I submit the defect list to get the things done, he said if I submitted yesterday I'll be 56th on the waiting list. 56th??!! I don't think they can kaotim a unit in a day. So for sure I won't get the defects ratified in a month! That's for sure. And if I submit the defect list after the door is installed, I would be what? 356th on the waiting list? I mean come on!!

How can you collect money from me and telling me that the unit is FIT to occupy? Make no sense at all man.

Guys whoever you are. What do you suggest me to do? I just want to get the things done and move on! Time is essence. No point complain here and there and get no further from the problem I already have.

Gotta say, disappointing. I really do. We are paying good money for things like that..

P/S: I noticed that some of the room doors have these weird holes on the side. I guess they accidentally drill the wholes on the wrong side of the door and the just simply amend it by filling the holes and painted it to cover up. Should I request to replace the doors or is it normal to do that way? Cause the last time I check a door can cost a few hundreds. I mean I've already paid so much for the Kondo. Takkan I wanna buy some defect??

Gosh. The more I type the the more fire I get.
*
Hi yunashiwa, I have the same problem. I've marked close to 200+ defects to-date, the maintenance guy told me he need 1 month to deal with my defects. He took the main door keys because that door has to be replaced to meet the approved bomba-standard, and also he will need it to access my house to rectify the defects. I must say, that the very busy maintenance-guy (appointed by Villamas) had only glance through for less than 5 minutes and then he whispered to the indon worker he brought along to "work on" my unit, I'm guessing that he has number of other complain-owners to deal with.

Initially he said my defects were minor, as though I was the one making a fuzz over it. But after I've walked him through the house with all 200+ marks, he knows that I am serious with my required quality standard.

I guess only annoyed-owners like you and me, can share the sentiment of being 'misguided' with their much promoted "luxury high-end condo" with an actual "low-cost apartment" quality. I hope Villamas will to work on rectifying the defects and ban this contractor that they use in all their future projects. I am seriously wondering how are they selling Zeffer, now that Atmosfera has this teething issues.



Chunkit9
post May 28 2012, 09:18 PM

Casual
***
Junior Member
324 posts

Joined: Feb 2012
Hi guys, mind to take photo of the defect u mentioned.. So we can make sure it will not happen in my unit... I wentto see my unit in block B. the next visit i will pay more attention on the defect that u guys mentioned.. Hopefully u can provide some photo of the defect... Thanks..
findingpeace
post May 31 2012, 02:03 PM

New Member
*
Newbie
3 posts

Joined: May 2012
QUOTE(Chunkit9 @ May 28 2012, 09:18 PM)
Hi guys, mind to take photo of the defect u mentioned.. So we can make sure it will not happen in my unit... I wentto see my unit in block B. the next visit i will pay more attention on the defect that u guys mentioned.. Hopefully u can provide some photo of the defect... Thanks..
*
In my case, the walls are the main problem, you can spot all defects with naked eyes. The workmanship was so poor that I think Villamas should redo the plaster on all walls. Have your defect checklist ready when you are to check on your unit. Otherwise, get your close friend or any honest reno contractor to give you an idea. Hope that help.
hornbill_78
post May 31 2012, 02:57 PM

Regular
******
Senior Member
1,145 posts

Joined: Jun 2011
My friend told me Villamas project workmanship is suck. He brought unit Villa Park Condominium at Bukit Serdang need spend almost 2 month the get the defect solved.
viper88
post May 31 2012, 03:05 PM

Look at all my stars!!
*******
Senior Member
2,359 posts

Joined: Apr 2006


My sister n her bf oso bought 1 unit at atmostphera.. lucky they bought early abt 370k+. Their unit workmanship so far quite good.

Villamas isit same like the Villa Wangsamas ?
That condo also poor workmanship.. alot crack and can be seen when driving pass by...
I almost buy one unit last 3 yrs coz its freehold and alot freebies... lucky din buy.. the condo colour also look dull type.
Heard there will be new phase launching soon.... price abt 500k range+

QUOTE(hornbill_78 @ May 31 2012, 02:57 PM)
My friend told me Villamas project workmanship is suck. He brought unit Villa Park Condominium at Bukit Serdang need spend almost 2 month the get the defect solved.
*
twincharger07
post May 31 2012, 03:07 PM

Look at all my stars!!
*******
Senior Member
4,788 posts

Joined: Feb 2011
herm... i am surprised.. my villa pavilion was ok.. although it is just apartment but the finishing i tot it is quite acceptable, not much defect, but just touching up some paint work, filling between tiles and changing the door lock hmm.gif
Alvinyeo
post May 31 2012, 05:00 PM

Talk is Cheap
******
Senior Member
1,752 posts

Joined: Jun 2010


Now selling at RM480K.

Last time launch around RM300K.

Earn RM180K in 3 years. Not bad.

Too bad i din't bought.

17 Pages « < 6 7 8 9 10 > » Top
 

Change to:
| Lo-Fi Version
0.0300sec    0.34    6 queries    GZIP Disabled
Time is now: 7th December 2025 - 11:44 PM